Monday, April 4, 2011

What is going on with Quest?

1. On Sunday Quest lies in the Dockyard, with a white funnel and new sponson on the stern. Not visible - the mystery black paint on her port side.
2. Quest prepares for haul out at Aecon-Fabco in Pictou. Unattractive plating on her superstructure was added in the 1997-99 refit.


3. Alongside at Pictou - this side of the ship was not tampered with, and the sponson has not appeared yet.


4. As built, Quest had a variety of square and round deadlights and an open side deck. In this photo her flying bridge has tarps rigged to provide some shelter.



The research vessel CFAV Quest AGOR 172 is attached to the Royal Canadian Navy and carries on research for Defence Research and Development Canada.

There was concern last summer when she had to be tied up for unspecified deficiencies. See:



However the ship was towed off to Pictou for a major refit, including about a month hauled out on the slip. When she returned to Halifax late in the year she was tied up for a while at Jetty Lima, in Dartmouth. She has now moved to the Dockyard, and here is where the mystery begins.

Soon after arriving in the dockyard, her " funnel" (a large structure combining her crows nest and signal mast, etc.,) which has always been a buff colour, was repainted white. She has also acquired a sponson near the stern on the starboard side.


It now appears that the entire starboard side of the ship has been painted black - the mystery deepens!


The ship was built in 1968 by Burrard Dry Dock in Vancouver, and was commissioned in 1969. It is powered by 4 Fairbanks Morse diesels, driving 2 General Electric propulsion motors, and displaces 2130 tons. The pennant letters AGOR signify an auxiliary vessel (civilian crew) for hydrographic and oceanographic research.


.

Sunday, April 3, 2011

Leif Ericson - Leif the unlucky?

1. Atlantic Fir has the bow line and Atlantic Willow the stern as they haul Leif Ericson up the harbour this afternoon.
2. Once clear of the Angus L. Macdonald bridge, they line up for the Novadock.


3. With the ship snuggled into the drydock, the tugs prepare to let go.



Leif Ericson, in port since January 4 for a major refit, emerged from drydock March 9, for final fitting out at Woodside. That move was made as a cold move - the ship' engines were not used.


She has been scheduled to leave port several days, but today, she headed back into drydock, also a cold move - no engines. She is powered by a pair of normally reliable Wartsila engines, but there is obviously something amiss. Stay tuned.


.

Saturday, April 2, 2011

Princess of Acadia good for another year?

Princess of Acadia has completed her refit at Halifax Shipyard: 1. As of 8 am she was still high and dry in the Novadock , with anchor chains out.
2. She clears the dock at 7 pm promptly. Her own crew will paint the upperworks, but the hull is newly repainted.


3. Her lines are still elegant, as she fires up her thruster. Her funnel discs have been removed, and her crew will have to reinstate those too.


4. A very sharp turn, with very little heel.


5. Heading out of the Narrows, the low sun shows a few dings in the hull. One notable one, high, near the stern., but she still looks great.



Included in the long list of ships that need to be replaced is Princess of Acadia. Built in 1971 by the much lamented Saint John Shipbuilding and Dry Dock Co Ltd, it replaced a ship of the same name on the 45 mile Digby, NS to Saint John NB run for Canadian Pacific Railway. Designed to carry 650 passengers and a combination of 159 autos/ 40 trailers, 7 tractors, the ship has done yeoman service under two owners and three managers.

In 1974 the ship was taken over by the Minister of Transport, and management assigned to CP. That lasted only until 1976 when management shifted to CN Marine, which was spun off as Marine Atlantic.

Bay Ferries took over management in 1997.

The service has been on life support for the last few years, with the governments stepping in at the last minute to provide emergency funding to keep the service going until a replacement ship arrives.

So far no replacement ship has been announced. Maybe during the current election someone will have to step up to the plate. No doubt they will announce a foreign purchase (again) because they failed to make plans in time to build in Canada.

Today's departure was delayed by high winds, and reduced visibility in snow squalls, but at 7 pm the ship stormed out of the dock - all on its own, without tugs- made a sharp turn to starboard , with her bow thruster going full tilt and her twin screws thrashing, and headed out to sea.

As a legacy of her railroad ownership days, she is still powered by her original four GM (V-16) 16-645-E5 engines, of 2875 bhp each. These were interchangeable with railway locomotive engines of the time, and can be endlessly rebuilt with ease. They drive twin screws with controllable pitch props at 18 knots+ cruising speed.

Lloyd's Register gives her passenger capacity as 641 unberthed, with 7 cabins and 9 berths. These later are VIP only as I understand it. Theses numbers do not include quarters for a crew of 28. Lloyd's also gives vehicle capacity as 155 cars, 36 "lorries." These are loaded by means of bow and stern doors.

.

Wednesday, March 30, 2011

Teekay Product Tanker

1.
2.



Teekay Shipping , the Vancouver based world wide tanker operator, is better known for its crude carriers. However they do have eight chemical/product tankers in their 136 ship fleet. Among that group is Teesta Spirit (ex Jeanette -07, Athenian Harmony -04) 29, 242 gross tons, 46,921 deadweight tonnes.


Photo 1:

It is shown arriving at anchor with the pilot boat A.P.A. No. 20 coming alongside to disembark the pilot. Since it is carrying cargo it required a tug escort inbound, and the tug Atlantic Fir is now returing to base. The ship's agent is also coming aboard on Dominion Diving's boat Halmar, and the bunkering tanker Algoma Dartmouth is also coming along for refueling.

Photo 2:
On completion of fueling Halmar returns to the ship, this time with a pilot for the outbound trip. A tug will soon be joining to escort the tanker.


.

Monday, March 28, 2011

Nirint


The much travelled Nirint Canada arrived Sunday afternoon to unload and load. Operating a bi-weekly liner service between Europe, South America, the Caribbean (including Cuba) and Canada, Nirint has found a niche in the transatlantic container/cargo business. Capable of carrying bulk, break bulk, containers and reefer containers, Nirint Canada is a tremendously versatile ship. In addition to all of that she is fitted with two 150 tonne capacity cranes, that can work in tandem to lift 300 tonnes. At 8861 gross tons, 12,002 deadweight tonnes, she is similar to Clipper Merlin that was in last week.

Built in 2001 by Dalian Shipyard in China she is typical of a large fleet of ships built originally for Clipper Elite Carriers (CEC). Built as CEC Arctic, she was renamed Beluga Independence in 2001 and in 2007 became Nirint Force. She then found work as Obsession in 2009, Stinnes Passat in 2009 and Keitum in 2010. She returned to Nirint as Nirint Canada in 2010. She is owned by Eckhoff of Jork, Germany and flies the flag of Anitigua and Barbuda, and is registered in St. John's, Antigua (not St.John's, Newfoundland.)

While in Halifax she will unload bagged nickel sulfide concentrate at pier 28, then this afternoon will move to pier 31 to load boilers and other heavy cargo.


.

Sunday, March 27, 2011

Still waiting for spring in Pictou County.

At the Aecon Fabco shipyard in Pictou the sailing ship replica Hector sits on the ways awaiting its first refit. The assessment of work is to be completed next week. See more on this interesting vessel at http://www.townofpictou.ca/hector_story.html . . The Town of Pictou has recently received financial support to re-open the ship to the public this year when the refit is finished. . Alongside, the navy tug Glenside has completed drydocking and an extensive refit that began last fall. Also at the yard is the tug Mary Steele which is likely there to assist with yard work. The McDermott (Secunda) suppliers Sable Sea and Hebron Sea are also in port in winter layup. .

Meanwhile at nearby Caribou the ferries Confederation and Holiday Island are in winter layup. The season for them normally starts May 1, but Holiday Island is kept in reserve until the height of the tourist season. The white line on the horizon to the right is sea ice.


Northumberland Ferries Ltd has not published its 2011 schedule yet, but when it does it will appear at :http://www.peiferry.com/ [see Update on this topic April 9, 2011]


.

Saturday, March 26, 2011

The first Butterfly of spring


The Greek owned, Bahamas flag tanker Butterfly is anchored in Bedford Basin. Built in 2005 it is a 26,913 gross tons, 47,326 deadweight tonnes product tanker built by the Onomichi Zosen KK yard in Japan. As with all modern tankers it is double hulled. It also carries heating coils for its cargo.
There seems to be some delay at the refinery. The ship arrived March 23, and went to anchor March 25. A crude oil tanker has been expected for some days, but it is waiting off Halifax at anchor.

.