Friday, December 6, 2013

Explosion Memorial

Today's anniversary of the Halifax Explosion of 1917 brought many people out to special  memorial services.

1. The memorial bells on Fort Needham, above the Narrows, sounded at 9:05 am - the time of the explosion.

2. Few physical reminders of the explosion remain in the area where it occurred. This abutment is all that remains of a bridge that crossed the rail tracks from Barrington Street to pier 9. The bridge itself was obliterated, along with all other buildings in the area.

3. The "Ground Zero" shoreline, on the right is now buried by Halifax Shipyard's expansion to pier 6.  Fort Needham is the hill on the right skyline.  

4. Numerous explosion artefacts were dredged up during the construction, and have now been removed from the site.


5. Others will likely remain be buried for posterity.

 .

Crane move - nearly complete

The Halterm crane move apparently took place over night, because by this morning it was at pier 36, and workers were burning off the lifting brackets and preparing to set it down in position.
1. Crane #3 now at pier 36.

There seemed to be very little inconvenience to shipping. Normally the St-Pierre feeder Fusion would work at pier 36 on Friday, using the RoRo ramp. Today she was at pier 42. One has to wonder how they worked RoRo cargo since Oceanex Sanderling was at pier 41, monopolizing the only other RoRo ramp.

2. Fusion at an unusual dock.

.

Thursday, December 5, 2013

Crane - moving now

 At Halterm the southernmost crane on pier 41-42 has finally begun to move to its new position on pier 36.

1. To the left is the old crane (#3) on its way to a new position. The large cranes (Max 1 and Max 2) have been moved south out of the way, onto the new Pier C extension. 

When it proved impossible to move it by ship in September, it was decided to move crane #3 over land. Last week Global Rigging and Transport mobilized a multi-wheel dolly system and by today had moved the crane off its rails and clear of the pier face.

2. and 3. A system of dollies and hydraulic jacks was used to lift the crane and move it off its rails.

4. Last week the dollies were lined up in readiness to lift and move the crane.

5. At some point the newest Halterm cranes, Max 3 and Max 4 will also have to move out of the way to allow the older unit to pass on its way to pier 36 to join two similar small cranes.  There is also one crane (seen immediately behind Max 3 and Max4) which has special bogies, that allow it move back and forth between the roughly perpendicular pier 36, and pier 41 

.

Oceanex Connaigra - maybe moving soon

Oceanex Connaigra may soon be moving from her parking spot at pier 25-26. I hear she is due in Boston December 8 where repairs will be made to her balky controllable pitch propeller hub. She has been waiting in Halifax since November 23 either for the dock space to be available or the parts to be manufactured to make the repairs. (I hope they are not aboard the HS Beethoven or there may be furher delay.)

Meanwhile the reassuring thump of the Cabot can still be heard on the shores of the St.Lawrence. The sound of her engines (Pielsticks, built under license by Crossley Premier in Manchester) travels so well over the water that she can be identified day or night from miles off. The ship was to be retired on delivery of Oceanex Connaigra, but has been pressed back into service for the duration.



.

Wednesday, December 4, 2013

HS Beethoven - all may become clear- REVISED DECEMBER 5



When HS Beethoven arrived at dusk and in foggy, rainy, misty conditions on Monday December 2, it looked like a routine arrival, albeit the ship is not a regular caller.
The ship first appeared in Halifax on August 21, 2013 for Atlantic Container Line, as a substitute while regular ACL ships were in refit or under repair.    Monday's arrival was for Hapag-Lloyd, and again as a substitute on H-L's ATA Service, its traditional Transatlantic service between Europe and the North American east coast.
That it did nor leave on time on Tuesday was not particularly unusual because of high winds and heavy rain, which would have slowed unloading.
Now however we hear that there was an incident aboard involving the possible collapse of a container stack and the puncture of a fuel tank.
Repairs will take a considerable time, and the ship may well have be unloaded before it can sail again.
Updates will be posted when available.

HS Beethoven was built by Hanjin Heavy Industries of Busan, South Korea in 2002 as HS Voyager for Hansa Shipping of Germany - its current owners. It was renamed MSC Arizona in 2003 for a charter and then APL Italy in 2005 for a charter. It received its present name in 2009. It measures 50,243 gross tons and had a capacity of 4,350 TEU (500 refrigerated.)

DECEMBER 5

HS Beethoven at Fairview Cove this morning was still being unloaded. It does appear that the ship will have to be completely unloaded, and its cargo transferred to other ships.

HS Beethoven - all may become clear



When HS Beethovern arrived at dusk and in foggy, rainy, misty conditions on Monday December 2, it looked like a routine arrival, albeit the ship is not a regular caller.
The ship first appeared in Halifax on August 21, 2013 for Atlantic Container Line, as a substitute while regular ACL ships were in refit or under repair.    Monday's arrival was for Hapag-Lloyd, and again as a substitute on H-L's ATA Service, its traditional Transatlantic service between Europe and the North American east coast.
That it did nor leave on time on Tuesday was not particularly unusual because of high winds and heavy rain, which would have slowed unloading.
Now however we hear that there was an incident aboard involving the possible collapse of a container stack and the puncture of a fuel tank.
Repairs will take a considerable time, and the ship may well have be unloaded before it can sail again.
Updates will be posted when available. 

HS Beethoven was built by Hanjin Heavy Industries of Busan, South Korea in 2002 as HS Voyager for Hansa Shipping of Germany - its current owners. It was renamed MSC Arizona in 2003 for a charter and then APL Italy in 2005 for a charter. It received its present name in 2009. It measures 50,243 gross tons and had a capacity of 4,350 TEU (500 refrigerated0.

Sunday, December 1, 2013

Jan van Gent

There is no filter for "snain" * that nasty mixture of snow and rain that fell periodically in Halifax today. That is why pictures of the Dutch ship Jan van Gent are extremely fuzzy.

The ship is owned by Wagenborgs, but painted in untypical colours, and is chartered to Nirint, another Dutch company, for its trade with Cuba. The ship is on its return leg from Cuba to Europe, and carries a load of nickel sulfides mined in Cuba for processing in Canada.
In 1960 Fidel Castro's government nationalized the nickel mines and processing plants operated by Freeport McMoRan Corp. As I understand it, FMC had been pressuring Castro to keep in place lucrative tax breaks granted by the previous dictator Bautista. Those breaks and a virtual blank cheque issued by the US government to stockpile nickel and cobalt from the mines as strategic assets had been a cash cow for FMC. Subsequent US governments were not so sure about the necessity of the stockpiles, and much of the dealings that FMC had with Bautista.
Subsequently the Canadian company Sherrit International formed a joint venture with Cubaniquel to mine, process and sell the nickel. The move raised the ire of Cuban foes in the US, and the Helms-Burton Act (the Cuban embargo) resulted in Sherrit executives being banned from the US.
Nevertheless the arrangement with Sherrit has been in place since about 1991 and nickel represents one of Cuba's largest sources of foreign exchange.
Jan van Gent will unload the nickel sulfides into waiting rail cars at pier 31, and the cargo will head to Fort Saskatchewan, AB for refining. It will then be exported to Europe. The material is tricky to handle, since it flows easily and can create instability in a ship if not stowed properly. The sulfides from Cuba come in giant bags, that are hoisted off the ship with its own cranes.
The ship was built in 2009 in Yiching, China by Damen Yiching Shipyard, created by the Dutch shipbuilding company Damen (they also have yards in Viet Nam and Romania). It measures 8,999 gross tons, 12,080 deadweight tonnes, and carries two cranes.

* I did not invent the word "snain". I credit to the legendary Detroit weatherman Sonny Eliot.