Thursday, February 8, 2024

Mixed Bag

 It was a little bit of everything in the Port of Halifax today, February 8, including containers, automobiles, tankers and a Dockyard visitor.

The container sector was represented by NYK Daedalus arriving from Antwerp on THE Alliance's AL5 service. The 55,534 gt, 65,967 dwt ship is the "name ship" of class of eight with a capacity of 4922 TEU built by Hyundai, Ulsan in 2007. Most of its sister ships have called in Halifax with this one a regular since its first visit July 21, 2014.

The NYK Daedalus prepares to make its turn to back in alongside the PSA Fairview Cove container terminal. Tugs Atlantic Oak and Atlantic Beaver are on the ship's port side.

 The autocarrier Don Carlos, another regular, arrived mid-afternoon on the Wallenius Wilhelmsen transatlantic route. The ship has made the usual round of Zeebrugge, Bremerhaven Goteborg and Southampton. After discharging cars at Autoport it will move to Pier 9C tomorrow to offload RoRo cargo.

 Tugs Atlantic Larch. forward, and Atlantic Beaver, aft, met the ship in the Middle Ground area to steer it aroiund Macnab's Island and into Eastern Passage and Autoport.

As per a previous report: "Don Carlos was built in 1997 by Daewoo, Okpo and lengthened 8.6 meters in 2006 by Hyundai Vinashin in Vietnam and is now 62,141 gt, 28,147 dwt with a capacity of 7194 CEU. When the ship was lengthened the large billboard lettering on the sides of the ship was not re-centered, giving a slightly unbalanced look."

HMC Dockyard said goodbye to a long term visitor, SD Victoria, the British ship that gives world wide support to the Royal Navy. This is the second time that the ship has spent more than a month in Halifax. In 2022 it arrived on February 10 and sailed March 30. Its most recent arrival was December 27, 2023,and it has been alongside the whole time. There was a military exercise in Halifax yesterday, but if it was a participant in some way it never left the dock

On departure today the ship gave the US Guard base in Baltimore for a destination, but it came back in to Halifax in the early evening.

The tanker Navig8 Constellation (see yesterday's post) sailed at dusk for Houston. Its place was to be taken by Algoberta which arrived from the Kildair (Sprague) terminal, St-Victoire-de-Sorel, QC this morning and has been waiting at Pier 9B.

.




Wednesday, February 7, 2024

Navig

 Among the ships that hung about off Halifax during the recent snow fall was the Marshal Islands flagged Navig8 Constellation. The ship entered port yesterday, February 6, and tied up at Imperial Oil dock 3, to discharge a cargo of refined product from Antwerp, Belgium.

The ship was built in 2013 by the Shina Shipbuilding Co in Tongyeong, South Korea and is a MidRange IMO 2 tanker of 29,478 gt, 45,281 dwt. Built originally for United Arab Chemical Carriers of Dubai it was launched as UACC Muharraq but was renamed Nave Constellation on delivery to the Shinousa Group and operated by Navios Tankers Management. In 2016 it took its present name and has been managed by the Indian company Suntech Ship Management. It operates on the spot market in one of the 140 ship strong Navig8 pools. Navig8 was merged with ScorpioTankers in 2017. The publicly traded Navig8 may be in play again as there are press reports of a rumoured sale to Dubai owners.

.

Tuesday, February 6, 2024

Asian Captain and Weather

 The EUKOR car carrier Asian Captain has been in Halifax twice by my count, and both times the weather has been less than ideal to say the least.

The last time it was here,  November 22, 2022 , there was a big blow that caused the ship to return to sea when it was too windy to approach Autoport or to anchor in the harbour.

Yesterday, February 5, 2023, the ship returned to Halifax and tied up at Pier 9C there was about 30 cm (one foot) of fresh snow on the ground, but port workers had the Pier cleared in time for the ship to offload machinery.

Last evening the ship moved to Autoport and off loaded cars. That facility also had a mounumental job to remove snow without damaging the thousands of cars in storage there. Workers were able to clear off enough space for the latest deliveries, and the ship sailed early this afternoon, February 6, in a stiff breeze with a light combination of mist and snow in the air.


Built in 1998  by Hyundai Ulsan the Asian Captain was originally a 55,729 gt, 21,466 dwt vessel, but in 2007 it was lengthened from 228.78 to 248m overall length, thus increasing its tonnages to 71,383 gt, 25,765 dwt. Its original capacity of 6,246 CEU was thus increased to 6,460 CEU.

The container piers also had a massive job to clear their facilities but they are equipped and prepared to do this and there were few delays. Some ships remained offshore during the storm, as much due to the winds. The ability of longshore workers to reach the piers may also have been an issue as many roads were impassible for a day or so. 

What may be another weather related visit is the container ship MSC Malena which tied up at Pier 31 on Friday, Febraury 2. The ship sails on MSC's Canada Gulf Bridge service and normally would be en route from New York to Montreal with subsequent calls in CornerBrook and Saint John en route to Freeport, Altamira and Progreso. It sailed from New York January 31, but there is no posted ETA for Montreal. Schedules show it due in Corner Brook February 14 and Saint John, February 17.


Pier 31 is not a working berth for container ships, so it is possible the ship is in for repairs.

Built in 2000 by Samsung Heavy Industries in Geoje, it was launched as Santa Adriana and delivered as P+O Nedlloyd Algoa. It was immediateley renamed MOL Parana until 2002 when it reverted to P+O Nedlloyd Algoa. In 2005 it became Santa Adriana again for five years until it became EM Athens in 2010. Keeping that name for ten years it was renamed MSC Malena in 2020.

The 25,294 gt, 32,350 dwt ship has a capacity of 2506 TEU including 420 reefers, and carries four crane, three of 45 tonnes SWL and one of 35 tonnes SWL. 

 .


Saturday, February 3, 2024

New role for Woodside

 The Woodside waterfront on the Dartmouth side of the harbour is about to take on another role - albeit a relatively short term one.

An area in North Woodside between the Nova Scotia hospital at Mount Hope and the Irving Oil terminal has two piers, most recently known as the IEL dock and the Mobil dock and a few acres of back-up land. It is currently the home to Woodside Industries a steel fabrication facility operating as part of Irving Shipbuilding Inc.

The Woodside area has long been a distinct community with industrial, residential and institutional activities all close together. The piers were part of the Halifax Sugar Refinery, built in 1884. Under the direction of the Nova Scotia industrialist John F. Stairs it was merged with his Nova Scotia Sugar Refinery and the Moncton Sugar Refining Company in 1893 to form the Acadia Sugar Refining Company Ltd.

The Woodside facility was destroyed by fire in 1912 and rebuilt. The Halifax operation occupied a ten storey building, built in 1880 in the Richmond area which was levelled by the Halifax explosion in 1917. It had been the tallest building east of Montreal but was not rebuilt. Instead the Woodside operation was expanded under the newly formed Atlantic Sugar Refineries. (Acadia kept its brand name however.)


 In 1939 the Anglo-Dutch Refining Company became owners of Atlantic Sugar and operated the Woodside factory it until 1942 when it was closed. The re-allocation of ships due to wartime cut off the supply of cane sugar, and the coal used to power the plant was instead directed toward the war effort. (Canada's need for sugar was met by processing sugar beets, which are not grown in the Maritimes.) 

Sugar was rationed during World War II to prevent hoarding. Limited supplies were made available to civilians for canning, but its use as a sweetener was severely curtailed. Most sugar production was directed toward food for the military and manufacturing.

Following World War II Atlantic Sugar re-opened its Saint John, NB facility, but kept the Woodside operation shuttered. (The Saint John facility, built in 1912, closed in 2000.)

In 1963, seeking to take advantage of the new Canada-US Auto Pact, which eliminated tariffs on cars and car parts between Canada and the US, the Swedish manufacturer Volvo decided to set up an assembly operation in Canada to supply cars to Canada and the United States. By shipping parts to Canada and assembling the cars here, Volvo was able to avoid the duties on foreign built cars, and to sell in Canada and the US as Canadian-built. Volvo rented the empty Atlantic Sugar facility. They imported parts and CKD "knock-downs" over the pier, assembled cars in the plant and sent export cars to the US, initially be sea, over the same pier. Cars for Canada could be transported by truck or by rail.

In 1966 Volvo negotiated a ten-year tax relief deal and built a $1 million dollar factory at Pier 9 on the Halifax waterfront, adjacent to Halifax Shipyard, opening in 1967 (ironically within sight of the old Acadia sugar refinery). Volvo later built a new larger plant in the inland Bayers Lake industrial park and assembled cars there from 1987 to 1998.

Atlantic Sugar, since renamed Lantic Sugar, sold the Woodside lands to the Province of Nova Scotia in 1974 and the buildings were demolished. 

 

In this barely recognizeable Halifax of 1973, the Acadia Sugar buildings are still standing on the Dartmouth shore at the far right left background in the photo. (All the transit sheds on the Halifax side are gone now too.)

 Industrial Estates Ltd, a Provincial government crown corporation, tasked with attracting industry to Nova Scotia, managed the property and leased it to various users. 

HMCS Algonquin moved from Quebec to complete its TRUMP refit in ice free Halifax, using the Woodside pier.

The north dock has been used for ship repair, and refit, including oil rig mobilization and construction, warship upgrades and miscellaneous uses. 

 

The topsides structure for an offshore gas platform arrived on the Dutch heavy lift ship Happy Ranger and was landed on the Woodside dock and barged to the offshore site.

A large metal fabrication building has been used by several companies, but most recently by Irving Shipbuilding Inc to build complex shaped bow structures and signal masts for the Arctic Offshore Patrol Vessel project. The completed components are barged across the harbour to the Halifax Shipyard to be assembled with the other ship modules.

 

 The smaller south pier, which has been known as the Exxon Mobil dock was used by offshore supply vessels to take on stores, and other material for oil and gas exploration, development, operation and decommissioning.

An oil rig anchored in the harbour, a supplier at the dock with an Irving Oil tanker at the north dock, standing by.
 

IrvingOil's Woodside terminal is on the adjacent propery to the south of the Exxon Mobil dock, and forms a backdrop to the photo.

With the end of all offshore petroleum activity off Nova Scotia, the small south pier has been largely idle. It was considered to be "union territory" and was included in the International Longshore and Warehouse Union collective agreement definition for jurisdiction. Ship loading and unloading work at the pier had to be performned by ILA members. That no longer appears to be the case.

Since 2010 Atlantic Towing Ltd has used a small portion of the north pier as base for its harbour tugs. However last spring they moved to the former CCG base now operated by COVE (Centre for Ocean Ventures and Entrepreneurship) a little farther north on the Dartmouth shore at Dartmouth Cove.

Since last year the Woodside piers have been used for the transfer of components for the Vineyard Wind power project off Massachusetts. The large mono pile / towers for the wind turbines were brought in from Rostock, Germany on heavy load transport ships and transferred to the crane ship Orion which in turn proceeded to the work site and installed the towers, section by section.


 

 


 


That transfer work appears to have been shifted away from Halifax to Sydney, NS. The heavy lift ship GPO Sapphire arrived in Sydney January 27 and appears to have offloaded to shore at the coal terminal and sailed again for Rostock, Germany. The crane ship has been in Vlissingen, Netherlands since January 11, having sailed from Halifax December 31.

New Use

A notice appeared on January 30 seeking public comment on the latest use of the Woodside piers and backup land. Irving Shipbuilding Inc intends to build a temporary Materials Staging Facility to dewater, sort, and store dredged material from its Land Level Expansion project at Halifax Shipyard.  

To accommodate construction and launch of the next shipbuilding program - new frigates for the RCN - Halifax Shipyard is expanding its land base out into the Narrows where the floating drydocks used to be moored. In order to establish concrete caissons for the pier faces, the harbour bottom must be levelled and this involves removal of sediment by dredging.

The dredge spoil from the harbour bottom contains heavy metals and other contaminants that must be sent to a safe disposal site inland after initial processing. The plan is to build a bermed area on the Woodside piers to contain up to 20,000 cubic meters of material at a time that will be brought by barge and craned ashore. Once processed the actual contaminants will be trucked to the safe disposal (storage) area at an undisclosed location. Nearby Highway 111 may be the convenient route to that site, wherever it may be. (I had an idea that it was on Federal Governments Shearwater lands, but that is not mentioned in the submission.) The facility is to operate until December 2026.

Public comment on the project is invited until February 29, but there is no suggestion that changes might be incorporated.

.

Thursday, February 1, 2024

More Fallout

 I seem to have missed a news item from mid-January, that was not widely reported (nor apparently announced officially). It is that the Mediterranean Shipping company MSC, the world's largest container line, - will be investing in the PSA Halifax operations, by taking a minority equity position. PSA Halifax operates both the Fairview Cove and South End Container Terminals in Halifax, and MSC is currently the major customer at the latter facility, which they call PSA Halifax, Atlantic Hub.

Whether this investment has anything to do with the recently announced Maersk / Hapag-Lloyd joint venture called Gemini Cooperation (to take effect a year from now) is not known. The aim of that new scheme includes a high degree of reliability and on time performance which may be encouraging other lines to do the same.

 MSC currently has five lines running through Halifax (although not all lines call here on every trip). It is also rumoured that MSC may be reducing the number of calls in some of the other Canadian ports  - namely Saint John, Corner Brook and Montreal.

That may happen, according to some sources, when the current rail expansion is completed in the South End Terminal later this year. That project, which will expand in-terminal trackage from 8,000 feet to 14,000 feet, is well underway with new buildings, and new container storage areas under construction. Work has now started on the rail lines. Some new equipment will also be acquired to serve the new track, such as rubber tired gantries (RTGs) to replace the current diesel units with larger, electric ones. 

It also appears that at least one, if not both of the new Super Post Panamax container cranes that were delivered in November 2023, are now in service. (Both are shown in the photo above.)

.


Wednesday, January 31, 2024

Winter Break

 The Oceanex Sanderling has been plowing a regular furrow between Halifax and St.John's since 1988. Sailing from Halifax on Fridays, it normally returns to Halifax by mid-week. Since it was last tuned up in a major refit in Amsterdam in 2022 the ship has been once again capable of two trips a week if necessary, but has not done so to my knowledge since November 2021. In August of last year Oceanex moved its container and trailer operations from the South End Container Terminal to Fairview Cove, and still handles automobiles at Autoport.

This week it moved its schedule up a bit and the Oceanex Sanderling arrived in Halifax yesterday, Tuesday, January 30 and went to Pier 25 instead of PSA Fairview Cove.

It was soon attended by the dive tender Dominion Bearcat, which has been alongside all day yesterday and all day today.  (What appears to be ice in the water at the bow, is snow dumperd there from clearing operations at nearby piers.)

It is also worth noting that the ship has very few containers on deck - somewhat unusual - since it normally has a substantial deckload:

The ship had a more usual deck load when it arrived on Wednesday January 24.

Oceanex has a Saturday, February 3 departure scheduled for the ship, so whatever work is going on below the waterline appears to have been built into this week's schedule.

.

Monday, January 29, 2024

Untropical arrival

 The Sonderberg arrived today, January 29, from St.Thomas, Virgin Islands for Tropical Shipping. To say that the day was untropical is an understatement. Heavy snow, amounting to perhaps 15 cm (6 inches) and high winds reduced visibility and limited travel (schools were closed, etc.,) and therefore no photo as I did not leave comfortable world headquarters of Ship Central.

The ship appears to be an addition to the usual Tropic Hope and Tropic Lissette that maintain Tropical's weekly service from Halifax to Palm Beach, FL, San Juan Puerto Rico and various Caribbean islands directly or by feeder. 


 The Sonderborg is a 12,514 gt, 14,222 dwt  gearless container ship with a capacity of 1085 TEU including 200 reefers. It was built in 2012 by Nanjing Wujiazui. It will be back again February 5 and 19, so there may be a chance for a photo then.

The regular ships Tropic Hope built in 2018 and Tropic Lissette built in 2019 by Guangzhou Wenchong are 15,215 gt, 20,325 dwt / 20, 313 dwt respectively, with a capacity of 1145 TEU including 260 reefers and carry two 45 tonne SWL cranes.Both have recently completed their five year surveys and appear to be following normal routes, but may have been knocked off schedule by weather. The ships have been calling here since they entered service in 2019, while Tropical Shipping shifted its operations from Saint John to Halifax in 2017.

There is no mistaking a Tropical Shipping container. 

.