Showing posts with label Louis S. St-Laurent. Show all posts
Showing posts with label Louis S. St-Laurent. Show all posts

Monday, April 4, 2022

Remember When

 It was March 27, 1987 when ice began to "invade" Halifax harbour. After blocking the entrance to the port for several day, chunks of ice started to work their way inside. 

 

 The RCN's reserve training trawler / gate vessel Porte St. Jean was not bothered by a few "ice cubes".

At first a few interant chunks did not cause much concern, and ships were able to go about their business as usual. However the ice continued to build and  by April 1 was packed in solid.

Priding itself as "ice-free", Halifax had some 'splainin' to do, and it was this: The ice did not originate in Halifax, but came from the Gulf of St.Lawrence and had blown and drifted out into the ocean. Currents and onshore wind then moved it down along the coast and into Halifax. The ice was heavily broken up but well compacted, and continued to build in. 


Although it does not need breaking, drift-ice is difficult to navigate through because of pressure. Wind "grabs" the rough surface and moves the ice, and packs it when it hits an obstacle such as the shore or a ship. Tidal forces only exacerbate the effect. If ships are at light draft, the ice can damage propellors.

The sight of drift ice in Halifax is very rare - this was the first time since 1960 - as was the sight of the CCGS William (ex Sir William Alexander (i))  going out to lift harbour buoys so that they would not be carried away.

 

(The new Sir William Alexander was removed from service due to a defective derrick system, and its predecessor of the same name was re-commissioned from layup. It was built by Halifax Shipyards in 1959 and was one of the finest ships in the fleet. It was renamed William when it was laid up pending sale. It was less tan 30 years old and still in good condition.)

 CCGS Louis S. St-Laurent was also called in to work in its home port for the first time, to clear tracks for ships.

Several regular callers were able to make their way surprisingly well, even though they rarely if ever had to navigate in ice.

Atlantic Cartier even made its way west of George's Island outbound past the iconic lighthouse.

Ships tied up in port were jammed in  by ice in the cambers between piers. In places the ice rafted up to 2 meters deep.

Common Venture was at Pier 28 for a cargo of grain.

Ships tied up at sea walls were at risk of being forced off the dock by ice working in between ship and pier. The force of the wind and tide-driven ice was strong enough to part lines. Tugs were called to flush the ice away, and ships were constantly adjusting their lines.

The tug Point Vigour stood by astern of the USSR ship Elton at Pier 21 for more than 24 hours, flushing ice away from the seawall and the ship's propellor. A crew man stood by on shore, with his signature fur hat on, to tend to the ship's lines and gangway if needed. The Elton was in port to load flour for Cuba and was very lightly ballasted, with some prop blades exposed.

A number of fishing vessels were caught in port too - some were small wooden inshore boats, but others were large foreign vessels. Their captains did not want to sail through 10 kilometers or more of ice to reach clear water offshore.

 The East German factory trawler Ludwig Renn, out of Rostock, tied up at Pier 30-31 for the duration.

The pilot boat was too fragile to operate in ice and so the tugs Point Valiant and Point Carroll were deputised. Sometimes they could not work themselves in alongside ships, so pilots actually walked across the ice to embark. The ice was at its heaviest April 1 and 2.

By April 3 most of the ice had moved back out to sea thanks to a wind shift, but remnants remained for some time. Shipping returned to normal.

 Wallenius Line's weird autocarrier Aida, converted in 1980 from a bulk carrier, made its way through some small patches of ice to reach Autoport April 4. The ship was scrapped in December of 1987.

 Harbour ferry service, which was cancelled, did not resume until April 6. At least one daring soul had in the meantime walked (or clampered) across the harbour on the ice.

.


Tuesday, March 17, 2020

Back to the Basin

The action was in Bedford Basin this morning, with ACL's Atlantic Sail arriving for the Cerescorp terminal at Fairview Cove.


Second ship in the G4 series of ConRos, Atlantic Sail was out of service for eight months in 2019 for unspecified mechanical issues. It has been back in regular rotation since January 2020.

At anchorage in the Basin CCGS Louis S. St-Laurent was tied up with CCGS Edward Cornwallis transferring fuel. The Cornwallis will be going into a major vessel life extension (VLE) rebuild at Shelburne, so will not be needing much fuel in the near term.

The navy pup tug Merrickville was likely tasked with positioning fenders between the two ships.


CCGS Sir William Alexander moved from BIO to an anchorage in the Basin. It may be getting some fuel too. As part of the Edward Cornwallis VLE it will be getting new lifting gear - maybe a crane like the Alexander.

.

Sunday, January 12, 2014

Wild Night in the Harbour

Winds gusting in excess of 70 knots tore through Halifax over night creating difficult conditions in the harbour. There were no actual mishaps as far as I can tell, but there were some tense moments.

CCGS Louis S. St-Laurent arrived for fuel (see previous post) but it was too rough to tie up at Imperial Oil, so she went to anchor in Bedford Basin, moving to Imperial Oil dock #3 first thing this morning.(It will take 24 hours to fill her tanks.)

1. Louis S. St-Laurent moving to Imperial Oil this morning.

Next to arrive was the diminutive feeder ship Fusion. After a stormy crossing from St-Pierre, the ship went to Bedford Basin and after a couple of tries managed to anchor securely. Big swells coming in to pier 36 made it unwise to tie up there. The adjacent berth, pier 34 was also untenable so the bunkering tanker Algoma Dartmouth had already moved down to pier 9.

While this was happening the bulker Barkald at National Gypsum was straining its lines and its winches started to payout after reaching their strain limit. Fortunately the tug Atlantic Oak, which had sought shelter at Fairview Cove was nearby and was dispatched by Halifax Traffic. It got to the ship in a matter of minutes and managed to get it back alongside before any lines parted.

2. Barkald in more pleasant conditions last April.

The weather also delayed loading operations, and the ship's departure, which was scheduled for 0500 Sunday morning, was postponed to mid -afternoon. Monday

The lower harbour anchorages also became untenable, and the tanker Alice was on storm watch as it was at the limits of its scope. However its anchor held more or less, but its position was noticeably different this morning. Not so with Energy Pioneer. Its anchor must have been dragging too, and the decision was made to go to sea instead. It is due to return this morning and tie up at Imperial Oil #4.

3. Energy Pioneer in anchorage #3 yesterday morning

Things seemed to be under control within HMC Dockyard, but the fireboat Firebird spent the night at Jetty Lima on the Dartmouth side of the harbour instead of her normal berth on the Halifax side.

.

Thursday, January 31, 2013

Louis S. St-Laurent - in the Basin

1. At anchor, at anchorage number 10, Louis powers up the bubbler. 

CCGS Louis S. St-Laurent has sent the day in Bedford Basin doing ice bubbler trials.
With plus 12 degrees C (record high) temperatures in Halifax, there is no ice to bubble, but the ship is more comfortable doing the trials than it would be out at sea with gusts of up to 100 kph.
The system, consisting of a 2,000 hp thruster forces water up on either side of the vessel reducing friction and to prevent ice from adhering to the ship, increasing its efficiency through heavy ice.

2. The ship then upped anchor, moved to anchorage number 8, anchored again, and powered up the bubbler once more.