Friday, July 12, 2013

Sir William Alexander - crane refit


At the Bedford Institute of Oceanography, CCGS Sir William Alexander is in the midst of a crane refit. The ship was built in 1987 by MIL Sorel and is one of the many Canadian Coast Guard ships that will be getting a life extension refit in the next few years. Its crane however dates from 1998 when the ship was also given a major refit. Sister ship Edward Cornwallis has a conventional derrick for buoy handling.

1 comment:

  1. Mac,

    The Alex is in an along-side refit. The 5 year overhaul/ inspection is just one of the many things being repaired.

    ReplyDelete