Showing posts with label Hero. Show all posts
Showing posts with label Hero. Show all posts

Friday, October 24, 2014

Heroes at Rest

It seems fatuous for this blog to comment on recent events not related to shipping, but it is a time for everyone to remember that this country has many heroes whose deeds allow the rest of us to carry on a very normal life.




As two Canadian Coast Guard Hero class patrol boats, M.Charles M.B. and Captain Goddard M.S.M., rest quietly at the Bedford Institute this evening awaiting assignment, harbour traffic carries on as normal. The  CCGS Sir William Alexander stands by at her berth, and the tug Gulf Spray and barge return from a stores delivery to the bulker Atlantic Erie loading at National Gypsum.

Paralleling events in Ottawa, Quebec and Halifax, the calm harbour conditions follow almost three days of turbulent seas that prevented most ships from entering or leaving Halifax. The weather induced "lockdown" was eerily similar to the situations when many Canadians found themselves locked out, or as in my case, twice, locked in when familiar, and usually placid places were barricaded.
 


The cargo ship Zeelandia was held off Halifax for two and a half days due to weather, and finally made port this morning, and will now unload. The Swiss flagged ship works for the Dutch Nirint Shipping Co, carrying nickel ore cargo form Cuba, to be processed in Canada and sent on to Europe.

That Canada is able to carry on trade in this manner, with many nations, is thanks largely to heroes - sung and unsung - who have made possible the things we take for granted.

.


Friday, November 30, 2012

Halifax Shipyard - No Good News


CCGS Labrador in Halifax Shipyard's graving dock.
The first RCN vessel to transit the Northwest Passage, it was the navy's last arctic class ship when decommissioned in 1957 and handed over the Department of Transport.

A noted defence analyst sounded warning bells in today’s local newspaper about the much touted naval shipbuilding program at Halifax Shipyard.


Irving Shipbuilding hasn’t had much good news to report recently. With their Georgetown (Eastisle) yard shut down and little work in Shelburne (Shelburne Ship Repair) and much of its workforce now laid off, and the sudden departure of Halifax Shipyard’s CEO, the signing of a new labour agreement in Halifax with the CAW union should have been a bright spot this week.

However it is overshadowed by the possibility that a big change may be coming in the much touted Defence Procurement program.

The big shipbuilding agreement saw Halifax “the winner” with the award of the arctic patrol vessels (up to eight ships) and the frigate replacement (12 ships) but it now seems that the arctic patrol component may be canned.

In recent rumblings in Ottawa, from the Minister of National Defence among others, it seems that the Canadian Coast Guard will become an Armed Force, and will given the defence of the arctic - something the navy has had no experience with since the 1950s. At that time their icebreaker HMCS Labrador, was yanked from them and handed to the Department of Transport (later becoming the Coast Guard.) Powerful factions in the RCN have always shunned the arctic as beneath their dignity, but creating a new Armed Force seems an extreme way of dealing with these snobs. It seems more likely that political pressure from the US for border security and all sorts of environmental/ sovereignty/ and arctic navigation issues are at the root of the “armoring up” of the CCG.

This would mean cancellation of the Navy’s arctic patrol vessels in Halifax Shipyard, and adding ships to the Polar icebreaker program with Vancouver’s Seaspan Shipyard. The boats planned for Halifax were compromise ships, with reduced endurance/ice capability to offset the need for speed, weight of armour and weapons. The CCG wants long endurance heavy icebreakers that could work year round in any conditions, and with relatively light armament. This would be easy to achieve by building more Diefenbaker class icebreakers (only one had been planned originally.) With the USA in severe compromise for heavy arctic ships, and extended navigation in the arctic, this would make excellent sense.

But what a kick in the pants for Halifax!

So what will happen? According the analyst, Halifax will need a lot of work to make up the gap between the end of the Hero class and the ramp up to the start of the frigates, but there is no sign of anything yet. Much scrambling is in order, and much uncertainty is ahead for Halifax-in my prediction, lasting for two or three years at least. Worst case scenario - a major strategic alliance with a proven foreign hi-tech shipbuilder and the farming out of the really lucrative work.

Best case scenario? Nothing in sight.
\
Too bad.