Several bow bulwark components have arrived on the dock from Woodside and the centre mega block module that carries the ship's bridge is visible from time to time. The bow and stern blocks are under construction on the adjacent bay on the right.
The ship is the first in the six ship Arctic Offshore Patrol Vessel (AOP) contract. The last ship is due to be delivered by 2022.
.
No comments:
Post a Comment