Tuesday, October 14, 2014

Pier 9C open for business


The newly extended pier 9C is now open for business and welcomed its first ship this evening.

Onego St.Petersburg arrived with the components for overhead cranes to be installed in the new Halifax Shipyard building.



Built in 2011, the ship measures 5425 grt, 8215 dwt, and carries two 40 tonne cranes that can work in tandem. It is typical of the new breed of multi-purpose carriers with full width hatches, box shaped holds and pontoon type hatch covers, strengthened for heavy cargoes.Most visible from shore as it arrived were the orange beams for 100 tonne Kone overhead rolling cranes. Shipped in short sections, they will be bolted in place on site.

The new pier 9C extension (which used to be called pier 9D) was estimated to cost $73 mn, including a new concrete pier face, consisting of concrete cells and cope walls, asphalt surfacing for heavy loads, rail tracks,  a refurbished and extended storage shed with railroad loading doors, electric lighting and the usual equipment such as bollards and fenders.
The new facility will ease the pressure on the south end piers and bring back the Richmond Terminals (piers 9 , 9A, 9B and 9C) as a busy part of the port. Some advantages are the access to roads without going through downtown traffic and a quicker access to the rail yards in Rockingham.

In the pre container era, Richmond Terminals was a busy spot. At pier 9 the Volvo assembly plant was busy off loading crated car bodies, frames engines and other components.

Pier 9

Pier 9 also had a tanker facility, which still exists, connecting to tanks on Barrington Street.


Piers 9 A, B and C were almost always busy with the "Sun" ships of Saguenay Terminals

Pier 9A

Built as a corvette, but converted to a cargo ship, Bedford II operated from Pier 9A to St.John's for Newfoundland Canada Steamships - a precursor to Oceanex.
The jog in the rail just below the ship's name is the division between Pier 9A and Pier 9B.
On the right is one of the covered sideloading ramps which CSL used for only one year as a pallet load service to Newfoundland. Forklifts transferred the palletized cargo from the pier 9A shed to the ship, unaffected by weather.

The Newfoundland coastal schooner Delray at Pier 9A, handballing cargo from a CN boxcar. The jog in the pier face is just ahead of the schooner. There is no traffic on the MacKay bridge, which was brand new but had not opened officially when this photo was taken.
 
Pier 9A and B were equipped with a rail line and freight sheds, and their own population of pigeons.

Pier 9C handled a variety of ships for breakbulk cargo such as packaged timber. The piers were well served by rail lines.

Pier 9D had no seawall, only a roughly filled shoreline, and when it wasn't in use for parking truck trailers, it could be used to unload and store coal as it did several times over a period of years.


The new facility is quite splendid:

 Looking south, there is a huge open area for laydown. Note the Power plant as three stacks now (but only one in 1970)

Looking north, a portion of the new Pier 9C shed extension on the left. A line of  rubber fenders on the pier had not been installed yet when these photos were taken September 28. The pier now extends almost to the foot of the MacKay bridge west tower.

.

Saturday, June 23, 2012

Davino D for pier 9


1. Davino D arriving.
The chemical/product carrier Davino D is unloading heating oil at pier 9. A pipeline from the pier runs to the storage tanks on Barrington Street now operated by Wilson's Fuels. Wilson is an independent fuel dealer and operates its own gasoline stations and distributes and sells home heating oil. As an independent they are free to buy product from a variety of sources, including the local refineries or from abroad.
The Barrington Street tanks were once operated by Fina.
Davino D was built in 2005 and operated as Panam Caribe until 2007 then as Clipper Caribe until 2011. It is now owned in the Netherlands by DePoli Tankers, but is registered in the Bahamas. The ship measures 8,254 gross tons, 14, 246 deadweight tonnes.
After tying up alongside pier 9, Dominion Diving's Roseway rigged an oil containment boom around the ship in case of  a spill.
2. Roseway with boom.

3. At pier 9 discharging.

Saturday, October 16, 2010

Tanker for Pier 9

1. Bernora lines up for pier 9. The tug is on her port side.

2. Atlantic Oak has come alongside Bernora in the Narrows, and prepares to turn the ship to go alongside.

3. Bernora steams inbound from sea.


Pier 9 is more noted as the base of Teleglobe and its occasional cable ships, and it once was the site of the Volvo car assembly plant, and now also hosts McNally Construction's marine equipment (formerly Beaver Marine.).

However it has for many years been the site of a short pipeline connecting to a small tank farm on Barrington Street. The tank farm has passed though many owners over the years, but is presently owned by Wilson Fuel Co. The pipeline extends across the north end of the pier 9 shed, and CN's intermodal yard to the storage tanks.

Today the chemical/product tanker Bernora arrived with a parcel of fuel for Wilson's. The ship was built in 2008, and measures 8545 gross tons. Although registered in the Bahamas, it is owned and operated by the Norwegian form of Bergshav.